JAS 2027 SPM Playbook
Feedback breakdown and execution system
0The playbook on one page
The diagnosis. This is not a skills gap. Shikhar and Ram both acknowledge your technical depth, engineering credibility and product capability. The gap is behavioural and operational: whether your work shows up consistently, visibly and through the standard process.
What they are both really asking for. Predictability. Ram wants to stop repeating feedback. Shikhar wants to stop following up. At SPM level, your managers should be able to hand you a charter and stop thinking about it.
The goal for Jan to Jun 2027. Replace willpower with forcing functions: calendar gates, fixed rituals, templates. Structured, multi-charter execution should keep running even on low-energy weeks.
Five non-negotiables
- A PRD goes to design or dev only after it has cleared L1, L2 and L3, with the dates logged in its header.
- Every active charter gets at least one visible artefact every week. No charter goes silent for more than 5 working days.
- Every key meeting gets a written recap within 2 hours.
- Ram's review comments get fixes and a changelog within 24 hours.
- Every launch gets a launch-day note on the day it goes live, and an impact readout when the first clean data lands.
What "done" looks like by June 2027
- Two complete cycles (PRD, 3-level review, launch, broadcast), with a third underway
- Six monthly digests that form a timestamped record
- Sumit links Setu Live, Selection Gap and HiPo to you, not only to Shikhar or Ram
- Adjacent teams pull you into their reviews without you asking
The system at a glance
1Core diagnosis: four root habits
Every piece of feedback traces back to four habits.
| Habit | What it looks like | Counter-mechanism |
|---|---|---|
| 1. Builder's bubble Ram 2.2 to 2.4, Shikhar 3.2 | You solve problems informally with engineering and skip reviews, recaps and launch broadcasts | No-bypass gate · 10-minute decision notes · launch-day notes |
| 2. Perfectionism paralysis Ram 2.4, Shikhar 3.3 | Docs wait until they feel bulletproof, and review windows get missed | Time-boxed drafts · quality ladder · [Open Question] tags |
| 3. Burst-and-crash Ram 2.1, Shikhar 3.4 | You work intensely for 1 to 2 weeks after feedback, then drift back and assume things will move on their own | Gates booked up front · Friday audit · floor week · never miss twice |
| 4. Serial focus Ram 2.5, Shikhar 3.4 | One charter gets everything and the others go quiet | Primary/maintenance split · weekly pulse per charter · 5-day silence rule |
How the habits feed each other
Perfectionism makes a doc late. You skip the review to protect the launch date (bubble). The work stays invisible (low artefacts). Feedback arrives and you burst. The other charters starve during the burst (serial focus), and then you crash. Fixing one habit on its own doesn't hold, so the system below targets the whole loop.
2Ram's feedback
2.1 Inconsistency and the 1 to 2 week burst
What it really means. Ram is asking for consistency, not more effort. Each repeat costs him time and makes it harder for him to give you a bigger scope. People remember a visible slip after a good stretch more than the good stretch itself.
With the system: the escalation still happens. But the Friday audit in week 3 shows "HiPo: N", so you send a 15-minute pulse before logging off. The gap never reaches Ram.
Actions
- Take willpower out of the loop. Every habit in this playbook lives on your calendar or in a template, not in your memory.
- Book the review gates on the day you pick up a problem. Put L1 about 5 working days out, L2 about 8 and L3 about 13 to 14. A meeting already on someone's calendar forces you to deliver on bored weeks.
- Run the Friday Binary Audit (Template B) every Friday at 4:30 PM, and log the answers. That way you catch a dip in week 2, not week 6.
- Fall back to the floor week (Section 7) on slow weeks. You don't need a breakthrough. You need the floor done and the gates intact.
- Never miss twice. One missed ritual is noise. Two in a row means the old pattern is starting. Restart the next working day, without a catch-up burst.
- Check whether perception is changing. At the end of January, ask Shikhar whether the change is visible (Script D10). In late March, ask Ram what has changed and what is still missing.
2.2 Low visibility and working "in a bubble"
What it really means. In calibration, your case is made with evidence other leaders have seen, and unseen work is hard to argue for. Sumit is Ram's manager, so your visibility with Sumit runs through Ram. Every Sumit touchpoint should make Ram look well prepared, never surprised. Being a "thought partner" means adding value to problems you don't own.
With the system: you have already agreed with Ram that you own your tracks in these reviews. The pre-read went out 24 hours ahead, and Ram locked the slides the day before. You're in the room, driving the screen, and you open with a live demo and the ₹ impact. You field the questions, and the MoM goes out within 2 hours. Sumit leaves linking Setu Live to you.
The review lifecycle you own
Actions
- Agree ownership with Ram once (Script D6). For Sumit reviews on your tracks, you own the invite, pre-read and MoM, and Ram gets the final slides 24 hours ahead.
- Own the full review lifecycle (flow above). Agree with Shikhar that you will field questions on your tracks.
- Keep a weekly bubble-breaking slot. Attend one adjacent PRD review or strategy sync outside your pod each week; two is the stretch goal.
- Spend 20 minutes on the doc beforehand and bring two data-backed questions or suggestions.
- Prioritise teams whose work touches your charters. Ask Shikhar which forums Ram and Sumit pay attention to.
- Written comments on an adjacent PRD count too, and they stay visible afterwards.
- Treat every launch as a visibility event (see 2.3).
2.3 Skipping the standard PM process
What it really means. The process is how leadership gets to shape your work, trust it, and later defend it. If you skip it, decisions get made without them, even when the product is right. Then the work never feels owned at their level. Note the last step: publishing at launch is part of the process, not an extra.
With the system: a 1-page concept note clears L1, L2 and L3 asynchronously in a few days. A launch-day note goes out the day the fix is live.
The standard process, with its gates
Actions
- Plan backwards from the launch date. Start from the launch date and subtract design/dev time, then 2 weeks for the 3-level review, then 1 week for the concept note. Lock every date on the day you pick up the work.
- No-bypass gate. Nothing moves to design or dev until L1, L2 and L3 are complete and dated in the PRD header (Template A).
- Right-size the process, but never skip it. For small changes, a 1-page concept note can clear all three levels asynchronously. Every gate still happens and is logged.
- Launch-day note (Script D8). Draft it at code freeze and send it the day the feature goes live. It covers what shipped, why, how success will be measured, and when results will follow.
- Impact readout (Script D9). Pre-draft it with blank brackets (
[+X% conversion],[₹Y Cr GMV]). Set a reminder for 14 days after launch, and fill it in and send it as soon as the first clean data lands.
Worked example: launch on Mon 15 Mar 2027, 4 weeks of design/dev
2.4 Low artefact volume
What it really means. Artefacts let leaders see work move without having to ask. Low volume reads as low output, even when you are doing a lot of real work. The cause is mostly Habit 1 (work stays in huddles) and Habit 2 (docs held back).
With the system: ten minutes after the huddle, a 1-page decision note goes to the pod and Shikhar. That counts as an artefact, and it stops the decision from being reopened.
Actions
- Redefine "artefact." Any visible written proof that a track moved: a 1-page concept note, a data cut, a 3-slide readout, a recap email or decision note, a metric pulse.
- 10-minute conversion rule. Any huddle that produces a decision becomes a written note within 10 minutes.
- Time-box early drafts to 80%. Give yourself 15 minutes for an alignment email and two morning deep-work blocks for an L1 PRD draft. Mark unresolved edge cases with
[Open Question: …]and share the draft anyway. - Count artefacts weekly. The floor is 3 (one per charter) and the target is 5 or more. Log the count in the Friday audit.
2.5 Tunnel vision: serial vs. parallel charters
What it really means. "Same intensity" doesn't mean equal hours. It means every charter feels owned every week. Leaders judge parallel management by whether any charter ever goes quiet, not by how you split your hours.
With the system: Setu Live gets about 60% of your deep work, but Selection Gap and HiPo keep their fixed 15-minute slots. Monday's sweep catches the HiPo slip. You flag it to Shikhar with a recovery plan before anyone else does.
Primary / maintenance split
Actions
- Parallel weekly cadence. Every active charter gets at least one visible touchpoint or artefact every week.
- Primary/maintenance split. Use each maintenance slot for a progress pulse, a blocker escalation or an alignment email.
- 5-day silence rule. No charter goes more than 5 working days without a visible update.
- Choose the primary deliberately. Name next month's primary charter in each monthly digest, so focus is a decision rather than drift.
2.6 Document and slide rigour
What it really means. Ram reads for the point in seconds. When he has to hunt for it, he assumes the thinking is unclear, not just the writing. In a Sumit room, your slides also represent Ram's org in front of his manager.
With the system: every slide has a one-sentence takeaway headline and at most three blocks. Ram locked the deck 24 hours earlier.
The quality ladder
Actions
- Use the quality ladder (above). It lets you share at 80% early without ever sending Ram a raw draft.
- Put a 4-line executive summary at the top of every PRD and deck: the problem, the ₹/metric impact, the solution, and the open decisions needed.
- Apply the 10-second slide test. Each slide has one takeaway headline, written as a conclusion, and at most three blocks: problem/opportunity, then status/POC, then next milestone.
- Do a headline-only read. Before sending, read only the headlines and the executive summary. If the story doesn't stand on its own, fix it before anyone else reads it.
- No first sightings in the room. Ram gets the final leadership slides 24 hours ahead (Script D4).
3Shikhar's feedback
3.1 Structured execution and pre-calculation
What it really means. Sizing is part of the product thinking. If impact and effort aren't locked before handoff, design and dev start on a moving target. When the surprises come, they land on Shikhar.
With the system: before L2, you sat with DS and engineering and locked three things: the expected uplift with its assumptions, the task breakdown, and sprint estimates for each function.
Actions
- Mandatory "Estimates & Sizing" block before L2 (Template A). It covers the expected ₹/metric uplift with assumptions, a granular task breakdown, T-shirt or sprint estimates for design, backend, frontend and DS, and dependencies with their owners.
- Add a sensitivity line, for example: "If uplift is half our estimate, impact is ₹X." It answers Ram's first question before he asks it.
- Protect morning deep work. Keep 60 to 90 minutes every morning for docs, estimates and pre-reads. Never leave them for scattered gaps between afternoon meetings.
3.2 Independent execution: zero follow-ups, zero cracks
What it really means. The SPM bar is that your manager can forget about your charters for a week and nothing breaks. Every time Shikhar has to chase you, it counts against that.
With the system: Tuesday's recap lists "Mocks: Design, Fri". A Thursday check-in shows a one-day slip. You message Shikhar first with what slipped, why, and the revised date.
Actions
- Send an opt-out recap within 2 hours of every key sync (Script D5). Never treat a verbal nod as alignment.
- Run a dependency sweep every Monday at 10:00 (15 minutes). Scan every active track across design, dev, DS and business. Ping the owner of any handoff due that week on Monday morning, not Thursday afternoon.
- Flag risks before Shikhar asks (Script D7). Say what is delayed, why, and what recovery you have already started.
- Track the zero-chase count. In the Friday audit, log every time Shikhar or Ram had to chase you. The target is 0.
3.3 Handling Ram's tough reviews
What it really means. The review itself isn't the problem; the gap after it is. A fast, visible fix turns a harsh review into a credibility win. Three or four days of silence makes the work look stalled.
The 24-hour turnaround
Actions
- Treat comments like bug tickets. Strip out the tone and keep the substance.
- Turn reviews around in 24 hours. Fix the doc and DM Ram a changelog within 24 hours. If an item genuinely needs longer, such as a fresh DS cut, still reply within 24 hours with what's fixed and a date for the rest.
- Get an L1 stress-test from Shikhar (Script D1) before every L2, and log his review date in the header. You keep full ownership of the doc.
3.4 Charter leadership and sustained momentum
What it really means. Trust is earned through repetition, and there's no shortcut. The target for January to June 2027 is 2 to 3 complete cycles with no gaps. Dip weeks are what you need to design around, because one bad dip can undo a month.
With the system: you recognise the early signs and switch to the floor week (Section 7). Your visible output stays steady.
Actions
- Send a monthly charter digest on the last Friday of each month (Template C). Over six months, the digests become a timestamped record for calibration.
- Write down your dip triggers in December (Section 7). Triggers you have named are manageable. Unnamed ones turn into three-week drifts.
- Keep motivation struggles private at work. On low weeks, lean on the checklists so your visible output stays steady.
4Operating rhythm and time budget
Daily
- Morning deep work, 60 to 90 min: docs, estimates, pre-reads
- Recap within 2 hours of every key meeting (~15 min each)
- Decision note within 10 minutes of any huddle that made a decision
Monthly
Digest on the last Friday, 30 to 45 minutes.
Per launch
Draft the launch-day note at code freeze. Set the impact readout reminder for 14 days after launch.
Weekly
| When | Ritual | Time |
|---|---|---|
| Mon 10:00 | Dependency sweep | 15 min |
| Tue | Pulse for maintenance charter 1 | 15 min |
| Thu | Pulse for maintenance charter 2 | 15 min |
| One fixed slot | Adjacent review (prep + meeting) | About 1 hr (stretch: 2) |
| Fri 4:30 PM | Binary audit, plus fixes for any "N" | 10 to 25 min |
5Templates and scripts
Tap "Copy" on any block to paste it straight into a doc or message.
Template A: PRD header and gate log
Paste this at the top of every PRD or concept note.
Template B: Friday Binary Audit (Fri 4:30 PM, 10 min)
Answer each question Y, N or N/A.
| # | Question | Y / N / N/A |
|---|---|---|
| 1 | Parallel pulse: Did Setu Live, Selection Gap and HiPo each get at least one visible artefact this week? | |
| 2 | Gates: Are all L1/L2/L3 reviews for the next two weeks on calendars? | |
| 3 | Recaps: Did every key meeting get a written recap within 2 hours? | |
| 4 | Outside the bubble: Did I contribute to at least one adjacent review, live or in writing? | |
| 5 | 24-hour rule: Did every Ram/Shikhar review get a response within 24 hours? (N/A if there were none) | |
| 6 | Launches: Did every launch get its launch-day note, and did every readout that was due go out? (N/A if there were none) | |
| Artefacts this week (floor 3, target 5+) | ___ | |
| Times Shikhar or Ram had to chase me (target 0) | ___ | |
- For any "N", spend 15 minutes fixing it before you log off.
- If the same question gets "N" two weeks in a row, treat it as a system problem. Change the calendar or the template instead of relying on more willpower.
- Log every audit in one running sheet. The trend is what catches a dip early.
| Date | Q1 to Q6 | Artefacts | Chases | One-line note |
|---|
Template C: Monthly Charter Digest (last Friday of the month)
2027 send dates
Template D: Communication scripts
6Timeline: December 2026 to June 2027
December 2026: light prep (set up, don't sprint)
The aim is for January to start on rails. Ram's one-month consistency window should run cleanly through January, not start in December and fade over the holidays.
| Week | Setup |
|---|---|
| 30 Nov to 4 Dec | Create recurring calendar events (list below). Paste Template A into every active PRD. |
| 7 to 11 Dec | Send D6 to Ram. Ask Shikhar three things (list below). Write down your dip triggers (Section 7) and set up the audit log. |
| 14 to 24 Dec | Dress rehearsal: run the Monday sweep and the Friday audit twice. Do the second audit on Thu 24 Dec, since 25 Dec is a holiday. Reverse-plan each charter's first 2027 milestone and send January's L1/L2/L3 invites. |
| 28 to 31 Dec | Nothing required. |
- A daily morning deep-work block
- Monday 10:00 dependency sweep
- Tuesday and Thursday maintenance slots
- Friday 4:30 PM audit
- Reminders for the six 2027 digest dates
- Which adjacent forums do Ram and Sumit pay attention to?
- Who should be on the launch-note distribution list?
- What is the JAS calibration timeline?
January 2027: flip the perception
- Run the full system from the first working Monday, 4 Jan (or your first day back).
- Take one full track through L1, L2, L3 without a single reminder from Shikhar or Ram.
- Keep the zero-chase count at 0 every week.
- Send Digest #1 on Fri 29 Jan.
- Do the 30-day check-in with Shikhar (D10) in the last week of January.
February to March 2027: build the rhythm, break the bubble
- Complete Cycle 1 on the primary charter: PRD, 3 levels, launch, launch-day note, impact readout. The other charters move through their gates in parallel.
- Own at least two Sumit reviews end-to-end. These depend on Sumit's calendar, so ask Ram early which forums are coming up.
- Attend one adjacent review every week.
- Send Digests #2 (26 Feb) and #3 (26 Mar).
- Do a roughly 90-day check-in with Ram in late March: what has changed, and what is still missing for SPM.
April to May 2027: cement charter leadership
- Complete Cycle 2 and start Cycle 3.
- Signal to watch for: stakeholders come to you directly as the charter owner.
- Send Digests #4 (30 Apr) and #5 (28 May).
- In May, compile your JAS dossier from the five digests, launch notes, impact readouts and PRD gate logs.
June 2027: calibration lock
- Digest #6 (25 Jun) doubles as your six-month summary.
- Share your track record with Shikhar and Ram before calibration discussions start (using the timing you confirmed in December), so your SPM case is easy to make.
7Dip-week protocol private
Early warning signs (two or more in one week means a dip week)
- You postpone or skip the Monday sweep or the Friday audit.
- A recap email is still sitting in drafts the next day.
- You're polishing one doc while another charter has had no update for 3 or more days.
- You catch yourself thinking "this will move on its own."
- You're avoiding opening Ram's comments.
The floor week (do only this; everything else waits)
- Monday sweep
- One artefact per charter (a 15-minute pulse counts)
- Recaps for key meetings
- One written comment on an adjacent doc
- Friday audit
Calendar gates don't move.
Your triggers (fill in during December)
Common ones to check against: overwhelm, boredom with routine follow-ups, perfectionism fatigue, deflation after a tough review, and the post-launch lull.
| Trigger | What I'll do instead |
|---|---|
| My trigger 1: | |
| My trigger 2: | |
| My trigger 3: |
Cells are editable in the browser for drafting, but edits are not saved. Copy them elsewhere.
Restart rules
8Review notes: what changed from your original and why
| # | Change | Why |
|---|---|---|
| 1 | The launch broadcast is split in two. | Your original waited for the first clean data before broadcasting, which conflicts with Ram's "publish immediately upon launch". Now a launch-day note goes out on day one, and an impact readout follows when the data lands. |
| 2 | A floor week and a time budget are added. | The original stacked about ten rituals with no view of the total load. With a burst-and-crash pattern, an overloaded system is the most likely thing to collapse in week 3. |
| 3 | Perception checkpoints are added. | The original assumed perception would flip without checking. Now you check with Shikhar at 30 days and with Ram at about 90. |
| 4 | A zero-chase count is added. | It's the most direct measure of what both Ram (2.1) and Shikhar (3.2) asked for. |
| 5 | The gate rule is tightened. | The original said both "dates logged" and "checked" before handoff. Ram's sequence is review first, then execute, so the rule is now "complete". If a track truly can't wait, agree the exception with Shikhar openly rather than quietly. |
| 6 | Small changes get a lighter process. | They can clear all three gates asynchronously on a 1-pager, but the gates are never skipped. |
| 7 | Review gates are staggered. | Booking L1, L2 and L3 all "1 to 2 weeks out" left no room for the 24-hour bounce-back. Now they sit about 5, 8 and 13 to 14 working days out. |
| 8 | The 24-hour rule is realistic now. | Items that need a new DS cut get a reply and a date within 24 hours, so the rule isn't simply missed. |
| 9 | Sumit visibility goes through Ram. | Sumit is Ram's manager, so you agree ownership with Ram once (D6). Every Sumit touchpoint is designed to make Ram look prepared. |
| 10 | The quality ladder resolves a contradiction. | "Time-box to 80%" and "never send Ram a raw draft" now work as one system. |
| 11 | The Friday audit goes from 4 to 6 questions and is logged. | The trend shows a dip early. |
| 12 | The artefact targets (floor 3, target 5+) are a suggestion, not Ram's. | Adjust them once you see what the strongest PMs around you actually produce. |
| 13 | Calibration timing was missing. | Confirm it with Shikhar in December so the dossier lands on time. |
| 14 | December prep is added, as you chose. | The full system starts in January. |